Resolving Production Constraints

A project on Theory of Constraints was carried out in the packaging department. A critical bottleneck was identified that limited overall production capacity by 20%. Key solution implemented was Drum-Buffer-Rope scheduling and optimized resource allocation to address the constraint. These measures increased throughput by 25%, eliminating the bottleneck and enhancing overall system performance. The project resulted in an additional INR 18 lacs in monthly revenue and improved delivery timelines.