Overall Equipment Efficiency (OEE)

Use this calculator to compute the Overall Equipment Efficiency (OEE) for your plant

  • e.g. if 2 shifts each of 8 hours, then Scheduled Production Time is 2×8 = 16 hours
  • enter both planned and unplanned downtime (in hours). Enter zero if there is no downtime
  • include initial set up time as well (in hours). Enter zero if there is no changeover time
  • This field is hidden when viewing the form
  • number of expected products to be manufactured
  • actual number of products manufactured
  • number of defective products manufactured. Enter zero if there are no defective products
  • This field is hidden when viewing the form
  • This field is hidden when viewing the form

Find where to start, and get on the right track